I see you Amanda.
This is the gauge to watch for the Humber River: 02HC025
We need 4 cubic metres per second for a successful run and rain is in the forecast. Maybe later in the spring, one can be squeezed in.
I see you Amanda.
This is the gauge to watch for the Humber River: 02HC025
We need 4 cubic metres per second for a successful run and rain is in the forecast. Maybe later in the spring, one can be squeezed in.